7. Water Supply Arrangement Keshpur (part Ii)
| Tender Title | 7. Water Supply Arrangement Keshpur (part Ii) | ||
| Tender ID | 2026_PHED_1019915_7 | Tender Reference Number | PHE/AE/MSSD/eNIT_05/2025-2026 2nd call |
| Tender Type | Open Tender | ||
| Tender Opening Date | 2026-03-11 10:30 AM | Tender Closing Date | 2026-03-19 12:30 PM |
| Tender Value | ₹ 4.76 L | Tender Location | Midnapore , West Midnapore , West Bengal |
| Tender Category | Works | Product Category | Water Storage And Supply Tenders |
| ePublished Date | 2026-03-09 01:00 PM | Bid Opening Date | 2026-03-23 04:30 AM |
| Document Download Start Date | 2026-03-10 03:30 AM | Document Download End Date | 2026-03-19 12:30 PM |
| Bid Submission Start Date | 2026-03-11 10:30 AM | Bid Submission End Date | 2026-03-19 12:30 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | 270 |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | ₹ 9,528 |
| EMD Fee Type | Percentage |
| Payment Instruments/Mode | Online |
Work Description - Water Supply Arrangement Keshpur (part-ii)
The PHE (a State Govt. and UT organisation) invites open tenders for the "Water supply arrangement Keshpur (PART-II)" project, valued at ₹4,76,410, with an EMD of ₹9,528 (2% of the tender value). The Tender Reference Number is PHE/AE/MSSD/eNIT_05/2025-2026 2nd call, and the Tender ID is 2026_PHED_1019915_7. Key dates include a document download start date of March 10, 2026, and an end date of March 19, 2026. Bid submission starts on March 11, 2026, and closes on March 19, 2026, both at specified times. The bid opening is scheduled for March 23, 2026. A pre-bid meeting will be held on March 11, 2026, at the Office of the Assistant Engineer Midnapore Sadar Sub-Division PHE Dte, Narampur Midnapore_Paschim Medinipur. Interested bidders can download the tender documents, including the declaration, WBF2911, notice, BOQ, and schedule, from March 10, 2026. The contract form is percentage based and online payment is available through ICICI Bank. The project location is Midnapore, with a work period of 365 days and a bid validity of 270 days. Bidders are required to submit two covers: a Fee/PreQual/Technical cover and a Finance cover including the BOQ. The tender is invited by Assistant Engineer Midnapore Sadar Sub-Division PH, located at the Office of the Assistant Engineer Midnapore Sadar Sub-Division PHE Dte, Narampur Midnapore_Paschim Medinipur.

Get Hassle free financing for your business
| Office Inviting Bids | Assistant Engineer Midnapore Sadar Sub-division Ph |
| Address | Office Of The Assistant Engineer Midnapore Sadar Sub-division Phe Dte.&#x0d Narampur Midnapore Paschim Medinipur&#x0d |
| Contact Details | NA |
| NA | |
| Website | NA |
Water Supply Arrangement Keshpur (part-i)..read more
4. Water Supply Arrangement Salboni (part-vi)..read more
Water Supply Arrangement Salboni (part-i)..read more
Additional Water Filling Arrangement..read more
Annual Operation And Maintenance Of Tirat Colliery Under Rcfa Part-ii Water..read more
All the major brands in each raw material category