Epc Package For Development Of 250mw Solar With 50mw/200mwh Bess Project At Sitapur, U.p.
| Tender Title | Epc Package For Development Of 250mw Solar With 50mw/200mwh Bess Project At Sitapur, U.p. | ||
| Tender ID | NA | Tender Reference Number | NRE-CS-5838-004(EPC)-9 |
| Tender Type | Open/advertised | ||
| Tender Opening Date | 2025-12-31 04:30 AM | Tender Closing Date | 2026-02-06 09:30 AM |
| Tender Value | Refer Document | Tender Location | Renewable Energy , Gautam Buddha Nagar , Uttar Pradesh |
| Tender Category | Services | Product Category | Energy Oil and Gas Tenders, Electrical Works Tenders, Solar Installation and Products Tenders |
| ePublished Date | 2025-12-31 02:23 PM | Bid Opening Date | 2026-02-06 10:00 AM |
| Document Download Start Date | 2026-01-07 04:30 AM | Document Download End Date | 2026-01-21 11:30 AM |
| Bid Submission Start Date | 2025-12-31 04:30 AM | Bid Submission End Date | 2026-02-06 09:30 AM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | ₹ 20,00,00,000 |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - Epc Package For Development Of 250mw Solar With 50mw/200mwh Bess Project At Sitapur, U.p.
NTPC Limited, a Public Sector Undertaking, invites open tenders for the EPC PACKAGE FOR DEVELOPMENT OF 250MW SOLAR WITH 50MW/200MWH BESS PROJECT AT SITAPUR, U.P. The project falls under the Services category and the Tender Reference Number is NRE-CS-5838-004(EPC)-9. There is no tender fee, however, the EMD is INR 200,000,000. The tender pertains to Electrical Goods/Equipment. Interested parties can download the tender documents starting January 7, 2026, at 10:00 AM, with the download deadline being January 21, 2026, at 05:00 PM. The bid submission start date is December 31, 2025, at 10:00 AM, and the bid submission end date is February 6, 2026, at 03:00 PM. The bid opening is scheduled for February 6, 2026, at 03:30 PM. The Tender Inviting Authority is DGM, NTPC Renewable Energy Limited, located at 4th Floor, Renewables Building, NETRA Complex E-3, Ecotech-II, Udyog Vihar, Greater Noida Gautam Buddha Nagar, Uttar Pradesh, India&ndash201306.

Get Hassle free financing for your business
| Office Inviting Bids | Dgm |
| Address | Ntpc Renewable Energy Limited 4th Floor, Renewables Building, Netra Complex E-3, Ecotech-ii, Udyog Vihar, Greater Noida Gautam Buddha Nagar, Uttar Pradesh, India&ndash201306 |
| Contact Details | NA |
| NA | |
| Website | NA |
Punjab-bess-05 For Setting Up Of 100 Mw/200 Mwh Battery Energy Storage..read more
Development Of 850 Kw Grid Connected Roof Top Solar Power..read more
Development Of 2115 Kw Grid Connected Roof Top Solar Power Project..read more
Package Punjab-bess-02 For Setting Up Of 100 Mw/200 Mwh Battery Energy..read more
Epc Package For Common Services, Ventilation Systems And Mechanical Equipment Package..read more
All the major brands in each raw material category