| Tender Title | Technology Consulting for 50-200 MWh Battery Energy Storage System Feasibility Study at NTPL | ||
| Tender ID | GEM/2026/B/7886430 | Tender Reference Number | NA |
| Tender Type | NA | ||
| Tender Opening Date | 2026-08-13 09:53 AM | Tender Closing Date | 2026-08-24 03:00 PM |
| Tender Value | Refer Document | Tender Location | NA , Tuticorin , Tamil Nadu |
| Tender Category | Services | Product Category | Consultancy Services Tenders, Energy Oil and Gas Tenders, Electrical Generators And Transformers Tenders |
| ePublished Date | 2026-08-13 12:00 AM | Bid Opening Date | |
| Document Download Start Date | Document Download End Date | ||
| Bid Submission Start Date | 2026-08-13 09:53 AM | Bid Submission End Date | 2026-08-24 03:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | ₹ 64,000 |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - NA
This tender, originating from NLC Tamil Nadu Power Limited (NTPL), with Bid Number GEM/2026/B/7886430, seeks proposals for the hiring of Technology Consultants. The primary objective of this consultancy engagement is to conduct a feasibility study for the establishment of a 50 to 200 MWh Battery Energy Storage System (BESS) within the NTPL site located at Tuticorin 628004. This initiative falls under the purview of the Ministry of Coal. The bidding period opens on 13-08-2026 at 9:53 AM and closes on 24-08-2026 at 3:00 PM. A refundable Earnest Money Deposit (EMD) of INR 64,000.0 is required from prospective bidders. The consultancy will be engaged on a milestone-deliverable basis, with a strong emphasis on onsite activities related to the technology assessment and feasibility study for the proposed BESS.

Get Hassle free financing for your business
| Office Inviting Bids | NA |
| Address | NA |
| Contact Details | NA |
| NA | |
| Website | NA |
Design2c Supply2c Installation2c Commissioning2c And Training Of A Different Battery Energy..read more
Design, Supply, Installation, Testing, Commissioning And Comprehensive Operation And Maintenance ..read more
Eoifor Development Opration Maintenance And Management Of 200 Mw Solar Battery..read more
Development Of 187.50mw/750 Mwh Battery Energy Storage System (bess) System Through..read more
Procurement Of Pilot Based Small Scale Standalone Decentralized Battery Energy Storage..read more
All the major brands in each raw material category