| Tender Title | Construction Of Flood Mitigation Structure Over The Left Edge Of Riversutlej At Village Bandala Block Ferozepur Distt. Ferozepur. | ||
| Tender ID | 2026_WR_165115_2 | Tender Reference Number | TN1349 |
| Tender Type | Open Tender | ||
| Tender Opening Date | 2026-04-02 03:30 AM | Tender Closing Date | 2026-04-16 04:30 AM |
| Tender Value | Refer Document | Tender Location | Xen Ferozepur Drainage-cum-mining Division , Firozpur , Punjab |
| Tender Category | Works | Product Category | Civil And Construction Tenders, Civil Works Others Tenders, Irrigation Work Tenders |
| ePublished Date | 2026-04-02 03:30 AM | Bid Opening Date | 2026-04-17 07:30 AM |
| Document Download Start Date | 2026-04-02 03:30 AM | Document Download End Date | 2026-04-16 04:30 AM |
| Bid Submission Start Date | 2026-04-02 03:30 AM | Bid Submission End Date | 2026-04-16 04:30 AM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | 120 |
| Tender Fee | ₹ 15000 |
| EMD (Earnest Money Deposit) | ₹ 13,29,481 |
| EMD Fee Type | Fixed |
| Payment Instruments/Mode | Online |
Work Description - Construction Of Flood Mitigation Structure Over The Left Edge Of Riversutlej At Village Bandala Block Ferozepur Distt. Ferozepur.
The Department of Water Resources, a State Government and UT organization, invites open tenders for the "Construction of Flood Mitigation Structure Over the left edge of River Sutlej at Village Bandala Block Ferozepur Distt. Ferozepur." as per Tender Reference Number TN1349. This works tender requires a fixed EMD of ₹13,29,481 and a tender fee of ₹15,000. Bidding will be conducted in two covers: Cover 1 requires Fee/PreQual/Technical documents, including the SBD, and Cover 2 is for Finance, including the BOQ. The document download and bid submission start date is April 2, 2026, at 09:00 AM, with a submission deadline of April 16, 2026, at 10:00 AM. The bid opening is scheduled for April 17, 2026, at 01:00 PM at the Drainage Cum Mining and Geology Division, Ferozepur. Interested bidders should download the tender documents, including the NIT and BOQ, from the designated portal. The work is to be completed within 60 days, and the bid validity period is 120 days. Further details can be obtained from XEN Ferozepur Drainage-Cum-Mining Division.

Get Hassle free financing for your business
| Office Inviting Bids | Xen Ferozepur Drainage-cum-mining Division |
| Address | Xen Ferozepur Drainage-cum-mining Division |
| Contact Details | NA |
| NA | |
| Website | NA |
Construction Of Flood Mitigation Structures Over The Left Edge Of River..read more
Construction Of Flood Mitigation Structure Over The Left Edge Of River..read more
Construction Of Flood Mitigation Structure On The Left Side Of River..read more
Construction Of Flood Mitigation Structures On The Left Side Of River..read more
Construction Of Flood Mitigation Structure And Berm Protrection On Left Edge..read more
All the major brands in each raw material category