Appointment Of Contractor For Construction Of Foot Over Bridge Connecting Vikhroli Metro Station And Kanjurmarg Railway Station
| Tender Title | Appointment Of Contractor For Construction Of Foot Over Bridge Connecting Vikhroli Metro Station And Kanjurmarg Railway Station | ||
| Tender ID | NA | Tender Reference Number | MMRDA/TnC/FOBL6/2025 |
| Tender Type | Open/advertised | ||
| Tender Opening Date | 2025-11-26 12:30 PM | Tender Closing Date | 2025-12-23 12:30 PM |
| Tender Value | Refer Document | Tender Location | Vikroli , Mumbai , Maharashtra |
| Tender Category | Works | Product Category | Bridge Construction Tenders, Civil And Construction Tenders, Civil Works Others Tenders, Construction Material Tenders |
| ePublished Date | 2025-11-26 12:30 PM | Bid Opening Date | 2025-12-24 12:30 PM |
| Document Download Start Date | 2025-11-26 12:30 PM | Document Download End Date | 2025-12-23 12:30 PM |
| Bid Submission Start Date | 2025-11-26 12:30 PM | Bid Submission End Date | 2025-12-23 12:30 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | ₹ 5500 |
| EMD (Earnest Money Deposit) | ₹ 3,00,000 |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - Appointment Of Contractor For Construction Of Foot Over Bridge Connecting Vikhroli Metro Station And Kanjurmarg Railway Station
The Mumbai Metropolitan Region Development Authority (MMRDA), a State Government and UT organization, invites open tenders for the appointment of a contractor for the construction of a Foot Over Bridge connecting Vikhroli Metro Station and Kanjurmarg Railway Station. This tender, categorized as Works and falling under Civil Works, is advertised under Tender Reference Number MMRDA/TnC/FOBL6/2025. The tender document, costing ₹5500, can be downloaded from 26-Nov-2025 06:00 PM until 23-Dec-2025 06:00 PM. Bids must be submitted between 26-Nov-2025 06:00 PM and 23-Dec-2025 06:00 PM. A mandatory Earnest Money Deposit (EMD) of ₹300000 is required. The bid opening date is scheduled for 24-Dec-2025 06:00 PM. This project aims to improve connectivity at VIKROLI by constructing a crucial infrastructure. Interested parties can contact the ADDITIONAL CHIEF at 7TH FLOOR, T AND C DIV, OLD MMRDA BLD, BKC for further details.

Get Hassle free financing for your business
| Office Inviting Bids | Additional Chief |
| Address | 7th Floor, T And C Div, Old Mmrda Bld, Bkc |
| Contact Details | NA |
| NA | |
| Website | NA |
Construction Of Foot Over Bridges For Mumbai Metro Line 4 And..read more
Provision Of Skywalk Connecting Badshahnagar Metro Station To Fob At Badshahnagar..read more
1. Bagnan : Provision Of 12.0m Wide Foot Over Bridge (fob)..read more
1. Blda : Provision Of 12.0m Wide Foot Over Bridge (fob)..read more
Redevelopment Of Kalighat Metro Station Of Metro Railway, Kolkata...read more
All the major brands in each raw material category