Removal Of Rotor And Re Assembling
| Tender Title | Removal Of Rotor And Re Assembling | ||
| Tender ID | NA | Tender Reference Number | B1EE/07/2025-26 |
| Tender Type | Open/advertised | ||
| Tender Opening Date | 2026-01-14 05:00 AM | Tender Closing Date | 2026-01-21 12:00 PM |
| Tender Value | Refer Document | Tender Location | Pawana Dam Maval , Kolhapur , Maharashtra |
| Tender Category | Works | Product Category | Machinery and Tools Tenders |
| ePublished Date | 2026-01-14 05:00 AM | Bid Opening Date | 2026-01-27 07:00 AM |
| Document Download Start Date | 2026-01-14 05:00 AM | Document Download End Date | 2026-01-21 12:00 PM |
| Bid Submission Start Date | 2026-01-14 05:00 AM | Bid Submission End Date | 2026-01-21 12:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | ₹ 2860 |
| EMD (Earnest Money Deposit) | ₹ 36,900 |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - Removal Of Rotor And Re Assembling For Purpose Of Dpr Rla Studey
This tender solicits bids for the "Removal of Rotor and Re assembling" at Pawana Dam Maval, issued under Tender Reference Number B1EE/07/2025-26. CE (Electrical) Hydro Electric Projects Mumbai, a State Government and UT organization, is the procuring entity. This open/advertised tender, categorized as "Works" within "Electrical Works," requires a tender fee of ₹2860 and an Earnest Money Deposit (EMD) of ₹36900. The detailed Work Description involves "Removal of Rotor and Re Assembling for Purpose of DPR RLA Study." Interested parties can download tender documents starting January 14, 2026, at 10:30 AM, with the deadline for document download and bid submission being January 21, 2026, at 05:30 PM. Bids will be opened on January 27, 2026, at 12:30 PM. The Exe Engineer, at the Hydro Electric and Lift Irrigation Design Division, Kolhapur, serves as the Tender Inviting Authority.

Get Hassle free financing for your business
| Office Inviting Bids | Exe Engineer |
| Address | Ex Engr Hydro Electric And Lift Irrigation Design Division, Kolhapur. |
| Contact Details | NA |
| NA | |
| Website | NA |
Removal Of Rotor And Re Assembling For Dpr Rla Study..read more
Set Of Rotor Stamping..read more
Rewinding Of Stator & Re-shafting Of Rotor Of 3-phase Traction Motor..read more
Dynamically Balanced Rotor..read more
1)rotor Forging Qty: 4 No 2)forging For Rotor Shaft Qty: 1..read more
All the major brands in each raw material category