| Tender Title | Chak Kathal Lift Irrigation Water Distribution Pipeline Project in Hamirpur | ||
| Tender ID | 2026_HPCDP_139691_1 | Tender Reference Number | No. Agr. HMR. DPMU (G) (7) P-II 2026-27 Vol-I Tender File-819 Dt 22.07.2026 |
| Tender Type | Open Tender | ||
| Tender Opening Date | 2026-07-23 06:00 PM | Tender Closing Date | 2026-07-31 11:00 AM |
| Tender Value | Refer Document | Tender Location | Chak Kathal,hamripur , Hamirpurhp , Himachal Pradesh |
| Tender Category | Works | Product Category | Irrigation Work Tenders, Water Storage And Supply Tenders, Pipe Line Project Tenders |
| ePublished Date | 2026-07-23 06:00 PM | Bid Opening Date | 2026-07-31 11:30 AM |
| Document Download Start Date | 2026-07-23 06:00 PM | Document Download End Date | 2026-07-31 11:00 AM |
| Bid Submission Start Date | 2026-07-23 06:00 PM | Bid Submission End Date | 2026-07-31 11:00 AM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | 90 |
| Tender Fee | ₹ 500 |
| EMD (Earnest Money Deposit) | ₹ 6,800 |
| EMD Fee Type | Fixed |
| Payment Instruments/Mode | Online |
Work Description - Providing Distribution System In Lift Irrigation Scheme Chak Kathal Under Hpcdp(phase-ii)-jica-oda At Village Chak Kathal,g.p Kala Amb,tehsil Distt. Hamirpur (h.p)
The Himachal Pradesh Agriculture Development Society (JICA-ODA loan), through its Tender Inviting Authority, the O/o District Project Manager, HPCDP (P-II) Hamirpur, invites eligible bidders for an Open Tender under the Works category. This significant project, bearing Tender Reference Number No. Agr. HMR. DPMU (G) (7) P-II 2026-27 Vol-I Tender File-819 Dt 22.07.2026, entails the "Providing Distribution System in Lift Irrigation Scheme Chak Kathal under HPCDP (Phase-II)-JICA-ODA at Village Chak Kathal, G.P Kala Amb, Tehsil Distt. Hamirpur (H.P)." The scope of work, located in Chak Kathal, Hamirpur, primarily involves civil works related to lift irrigation schemes, including the supply and installation of HDPE pipes, sluice valves, and hydrants, with a stipulated work period of 180 days. Key dates for this tender include the ePublication, document download, and bid submission commencement on 23-Jul-2026 at 06:00 PM. A mandatory pre-bid meeting will be held on 26-Jul-2026 at 11:00 AM at the Administrative Building, HPCDP (P-II)-JICA-ODA. The deadline for document download and bid submission is 31-Jul-2026 at 11:00 AM, with bids scheduled for opening on the same day at 11:30 AM at the O/o District Project Manager, HPCDP (P-II) Hamirpur. A non-refundable Tender Fee of ₹ 500 and an Earnest Money Deposit (EMD) of ₹ 6,800 are required, payable through online modes such as ICICI Bank NEFT/RTGS. Prospective bidders must satisfy specific eligibility criteria, including a minimum of 3 years of relevant experience within the last 10 years, demonstrating satisfactory completion of at least 3 irrigation/water supply works and one specific work as per NIT, possession of sound financial statements and average annual turnover for 3 years within the last 10 years, and proof of solvency. Further prerequisites include valid registration/enlistment, GST registration, a PAN card, a site inspection certificate, an affidavit confirming no previous penalization/termination under HPCDP JICA Phase-I/II, and submission of a detailed technical proposal including a performance curve chart for pumping machinery and proof of empanelment with manufacturers for HDPE pipes.

Get Hassle free financing for your business
| Office Inviting Bids | O/o District Project Manager,hpcdp (p-ii) Hamirpur |
| Address | O/o District Project Manager,hpcdp (p-ii)-jica-oda Hamirpur |
| Contact Details | NA |
| NA | |
| Website | NA |
Providing Distribution System In Lift Irrigation Scheme Kharwar Under Hpcdp (phase-ii)..read more
Providing Distribution System In Lift Irrigation Scheme Rohwin Under Hpcdp (phase-ii)..read more
Providing Water Source Development Including Distribution System In Lift Irrigation Scheme..read more
Providing Distribution System In Lift Irrigation Scheme Ramehra Under Hpcdp(phase-ii)-jica-oda At..read more
Operation And Maintenance For 3 Years ( 36 Month ) Of..read more
All the major brands in each raw material category