| Tender Title | Supply and Installation of 827 Air Conditioners with 5-Year Maintenance at Hyderabad SS | ||
| Tender ID | GEM/2026/B/7665148 | Tender Reference Number | NA |
| Tender Type | NA | ||
| Tender Opening Date | 2026-07-27 04:32 PM | Tender Closing Date | 2026-08-11 05:00 PM |
| Tender Value | Refer Document | Tender Location | NA , Gurgaon , Haryana |
| Tender Category | Goods | Product Category | Electrical Goods and Equipments Tenders, Building Construction Tenders |
| ePublished Date | 2026-07-27 12:00 AM | Bid Opening Date | |
| Document Download Start Date | Document Download End Date | ||
| Bid Submission Start Date | 2026-07-27 04:32 PM | Bid Submission End Date | 2026-08-11 05:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | Refer document |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - NA
This tender, identified by Bid Number GEM/2026/B/7665148, issued by the Power Grid Corporation of India Limited (Ministry of Power) on July 27, 2026, and closing on August 11, 2026, at 5:00 PM, seeks comprehensive proposals for the Supply and Installation of Air Conditioners at the Hyderabad SS. The scope of work encompasses the supply of ductable indoor and outdoor units with remote controls, specifically in 5.5 TR and 3.0 TR Cassette 4-way configurations, along with all necessary accessories as per detailed specifications. Furthermore, the tender includes provisions for lifting and shifting of both indoor and outdoor units, pressure testing, vacuumizing, and commissioning of the DX systems with refrigerant for the 5.5 TR units. Specialized installation services are required for suction and discharge lines, communication cables between indoor and outdoor units, CPVC drain pipes, GI ducting and plenum boxes, timer panels, and thermal insulation for plenum boxes. The tender also specifies the installation of extruded aluminum powder-coated eye-ball diffusers, GI butterfly dampers, flexible canvas connections, and MS supports for the 5.5 TR units. Critically, the contract mandates comprehensive maintenance services for a period of five years following the completion of the warranty period, covering the 1st through 5th year. The total quantity for this requirement is stated as 827 units.

Get Hassle free financing for your business
| Office Inviting Bids | NA |
| Address | NA |
| Contact Details | NA |
| NA | |
| Website | NA |
Supply, Installation, Testing And Commissioning Of Cassette Air Conditioners For Fag..read more
Supply, Installation And Commissioning Of 2.0 Ton Split Type 5 -..read more
Repair And Maintenance Of Central Air Conditioners At Various Location At..read more
Supply , Installation, Testing And Commissioning Of Inverter Type Air Conditioners..read more
Supply And Installation Of 2 Ton Split Air Conditioners With Stabilizers..read more
All the major brands in each raw material category