| Tender Title | Procurement and Installation of Containerized Battery Energy Storage System (BESS) 0.5 MW / 2 MWh | ||
| Tender ID | GEM/2026/B/7822489 | Tender Reference Number | NA |
| Tender Type | NA | ||
| Tender Opening Date | 2026-07-23 02:53 PM | Tender Closing Date | 2026-08-12 06:00 PM |
| Tender Value | Refer Document | Tender Location | NA , Gandhi Nagar , Gujarat |
| Tender Category | Goods | Product Category | Electrical Generators And Transformers Tenders, Energy Oil and Gas Tenders |
| ePublished Date | 2026-07-23 12:00 AM | Bid Opening Date | |
| Document Download Start Date | Document Download End Date | ||
| Bid Submission Start Date | 2026-07-23 02:53 PM | Bid Submission End Date | 2026-08-12 06:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | Refer document |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - NA
This tender seeks proposals for the procurement and installation of a Containerized Cabinet based Battery Energy Storage System (BESS) with a capacity of 0.5 MW and 2 MWh. The procurement is being managed by the Gujarat Energy Research & Management Institute (GERMI), under the Department of Energy and Petrochemicals, Government of Gujarat, with the office located in Gandhinagar. The bid number for this opportunity is GEM/2026/B/7822489. Prospective bidders are advised that the tender opens on July 23, 2026, at 2:53 PM and closes on August 12, 2026, at 6:00 PM. The tender documents, including detailed specifications and submission requirements, can be accessed via the GEM portal. This initiative represents a significant step towards enhancing energy management and storage capabilities within the state of Gujarat.

Get Hassle free financing for your business
| Office Inviting Bids | NA |
| Address | NA |
| Contact Details | NA |
| NA | |
| Website | NA |
Package: Long Term Agreement (lta) For Design, Supply, Erection, Testing &..read more
Package: Long Term Agreement (lta) For Design, Supply, Erection, Testing &..read more
Development Of 187.50mw/750 Mwh Battery Energy Storage System (bess) System Through..read more
Design, Supply, Installation, Testing, Commissioning And Comprehensive Operation And Maintenance ..read more
Design, Supply, Installation, Testing, Commissioning And Comprehensive Operation And Maintenance ..read more
All the major brands in each raw material category