Construction Of Road From Harimandir To Netaji More Burar Bandha Via Battala.
| Tender Title | Construction Of Road From Harimandir To Netaji More Burar Bandha Via Battala. | ||
| Tender ID | 2025_PRD_938642_16 | Tender Reference Number | 07/RR2025/SE/S24/2025-26 |
| Tender Type | Open Tender | ||
| Tender Opening Date | 2025-11-06 11:30 AM | Tender Closing Date | 2025-11-28 12:00 PM |
| Tender Value | ₹ 1.94 Cr | Tender Location | Diamond Harbour , South 24 Parganas , West Bengal |
| Tender Category | Works | Product Category | Road Construction Tenders |
| ePublished Date | 2025-11-06 11:30 AM | Bid Opening Date | 2025-12-01 05:30 AM |
| Document Download Start Date | 2025-11-06 11:30 AM | Document Download End Date | 2025-11-28 12:00 PM |
| Bid Submission Start Date | 2025-11-06 11:30 AM | Bid Submission End Date | 2025-11-28 12:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | 90 |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | ₹ 3,87,720 |
| EMD Fee Type | Percentage |
| Payment Instruments/Mode | Online |
Work Description - Construction Of Road From Harimandir To Netaji More Burar Bandha Via Battala.
The Panchayat and Rural Development, a State Govt. and UT organization, invites open tenders for the Construction of Road from Harimandir to Netaji More Burar Bandha via Battala. The tender, bearing reference number 07/RR2025/SE/S24/2025-26 and Tender ID 2025_PRD_938642_16, is valued at ₹1,93,85,980 with an Earnest Money Deposit (EMD) of ₹3,87,720, representing 2.0% of the tender value. Bidders must submit their SOQ (Fee/PreQual/Technical) and BOQ (Finance) in two separate covers. The document download and bid submission start date is November 6, 2025, at 5:00 PM, with both closing on November 28, 2025, at 5:30 PM. A pre-bid meeting is scheduled for November 12, 2025, at 12:00 PM at the Office of the Superintending Engineer, Presidency Circle-II, Panchayats and Rural Development Department Government of West Bengal, Joint Administrative Building, Sector III, Salt Lake, Kolkata 700106. The bid opening will occur on December 1, 2025, at 11:00 AM at the same location. The project is located in Diamond Harbour and has a completion period of 180 days, with a bid validity of 90 days. Interested parties can download the necessary documents, including the NIT and SBD, and submit their bids online. Tender fee is ₹0.00.

Get Hassle free financing for your business
| Office Inviting Bids | Superintending Engineer Presidency Circle Ii |
| Address | Office Of The Superintending Engineer, Presidency Circle-ii, Panchayats And Rural Development Department Government Of West Bengal, Joint Administrative Building, Sector Iii, Salt Lake, Kolkata 700106&#x0d &#x0d |
| Contact Details | NA |
| NA | |
| Website | NA |
Construction Of New Road From Chandni More To Bagnan College More..read more
Construction Of Pcc Road From Harimandir To Radhe Mandir At Chitmu..read more
Const. Of Pcc Road From Kaliada Harimandir To Icds..read more
Construction Of Concrite Road From Harimandir To Puirna Patra House At..read more
Repairing Of Road With Moorum From Netaji More To Petrol Pump..read more
All the major brands in each raw material category