Construction Of New Road From Karbala Pole To Chetuya Pole
| Tender Title | Construction Of New Road From Karbala Pole To Chetuya Pole | ||
| Tender ID | NA | Tender Reference Number | 12/RR2025/SE/HWH/2025-26 |
| Tender Type | Open/advertised | ||
| Tender Opening Date | 2025-11-10 10:30 AM | Tender Closing Date | 2025-12-02 11:00 AM |
| Tender Value | Refer Document | Tender Location | Howrah , North 24 Parganas , West Bengal |
| Tender Category | Works | Product Category | Road Construction Tenders |
| ePublished Date | 2025-11-10 10:30 AM | Bid Opening Date | 2025-12-04 11:00 AM |
| Document Download Start Date | 2025-11-10 10:30 AM | Document Download End Date | 2025-12-02 11:00 AM |
| Bid Submission Start Date | 2025-11-10 10:30 AM | Bid Submission End Date | 2025-12-02 11:00 AM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | ₹ 2,53,484 |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - Construction Of New Road From Karbala Pole To Chetuya Pole
This tender concerns the construction of a new road from Karbala Pole to Chetuya Pole in Howrah, West Bengal, under the authority of the PANCHAYAT AND RURAL DEVELOPMENT, a State Government entity. The Superintending Engineer, Presidency Circle-II, located at Joint Administrative Building, Sector III, Salt Lake, Kolkata 700106, is the inviting authority. This is an open/advertised tender, referenced as 12/RR2025/SE/HWH/2025-26, categorized as Works. The ePublished Date and Bid Submission Start Date are both 10th November 2025 at 04:00 PM, with the Document Download End Date and Bid Submission End Date being 2nd December 2025 at 04:30 PM. The Bid Opening Date is scheduled for 4th December 2025 at 04:30 PM. There is no Tender Fee, however, an Earnest Money Deposit (EMD) of ₹ 253484 is required.

Get Hassle free financing for your business
| Office Inviting Bids | Superintending Engineer, Presidency Circle-ii |
| Address | Office Of The Superintending Engineer, Presidency Circle-ii, Panchayats And Rural Development Department Government Of West Bengal, Joint Administrative Building, Sector Iii, Salt Lake, Kolkata 700106 |
| Contact Details | NA |
| NA | |
| Website | NA |
Construction Of New Road From Haldia Road Masjid Tala To Hariharpur..read more
Construction Of
 Concrete Road From
 Kamarpole Baganer
 Pole To Sarder Para
..read more
Construction Of Cc Road From Paschim Parulia Kunin Pole To Parulia..read more
Construction Of Road Required From Right Side Of Kundu Pole To..read more
Special Repairs To Road From Pole No 21 To Pole No ..read more
All the major brands in each raw material category