1.7 Kw 3 Phase 415 V Ac Heater Consists Of 3 Coils (startconnected) . Flange Mounted Length Of H Hopper Heater2.2kw 415v 50hz (for 600mw)
Tender Title | 1.7 Kw 3 Phase 415 V Ac Heater Consists Of 3 Coils (startconnected) . Flange Mounted Length Of H Hopper Heater2.2kw 415v 50hz (for 600mw) | ||
Tender ID | GEM/2025/B/5981241 | Tender Reference Number | NA |
Tender Type | NA | ||
Tender Opening Date | 2025-06-10 05:30 AM | Tender Closing Date | 2025-06-11 07:16 AM |
Tender Value | Refer Document | Tender Location | NA , Puruliya , West Bengal |
Tender Category | Goods | Product Category | Electrical Goods and Equipments Tenders, Machinery and Tools Tenders |
ePublished Date | 2025-02-26 06:30 PM | Bid Opening Date | |
Document Download Start Date | Document Download End Date | ||
Bid Submission Start Date | 2025-06-10 05:30 AM | Bid Submission End Date | 2025-06-11 07:16 AM |
Clarification start Date | Clarification End Date | ||
Bid Validity Period (in Days) | 90 (Days) |
Tender Fee | Refer document |
EMD (Earnest Money Deposit) | Refer document |
EMD Fee Type | NA |
Payment Instruments/Mode | NA |
Work Description - NA
Damodar Valley Corporation, under the Ministry of Power, invites bids for the procurement of 240 units of "1.7 KW 3 Phase 415 V AC Heater consisting of 3 coils (star connected). Flange mounted Length of Hopper Heater" and "2.2KW 415V 50Hz (For 600MW)". This tender, bearing Bid Number GEM/2025/B/5981241, originates from the Contracts And Materials Department located at 723133 Raghunathpur Thermal Power Station (RTPS) - DVC Technical Building, Dumdumi, District- Purulia. Bidding commences on 10-06-2025 at 11:00 AM and concludes on 11-06-2025 at 12:46 PM. The bid offer validity is 90 days from the bid end date. This procurement is for the Damodar Valley Corporation and is dated 27-02-2025.
Get Hassle free financing for your business
Office Inviting Bids | NA |
Address | NA |
Contact Details | NA |
NA | |
Website | NA |
Lt 3 Phase Ac Induction Motors..read more
Supply Of Hopper Heater, Insulator And Vibration Motor Panel..read more
As Per Tender Document..read more
Work Of Dismantling, Fabrication Erection And Hydraulic Testing Of 30 Tph..read more
Fabrication And Supply Of Esp Hopper Lower Part With Bottom Flange..read more
All the major brands in each raw material category