Tender Title | Improvement To Balgania Nalla Along With Structures In Nuagaon Block. | ||
Tender ID | 2025_CEDC_113597_1 | Tender Reference Number | ACEDC-BBSR/DD-KHR-01/2025-26 |
Tender Type | Open Tender | ||
Tender Opening Date | 2025-05-20 05:30 AM | Tender Closing Date | 2025-06-04 11:30 AM |
Tender Value | ₹ 2.48 Cr | Tender Location | Nuagaon , Nayagarh , Odisha |
Tender Category | Works | Product Category | Civil And Construction Tenders, Civil Works Others Tenders, Drainage Work Tenders, Irrigation Work Tenders |
ePublished Date | 2025-05-20 05:30 AM | Bid Opening Date | 2025-06-05 05:30 AM |
Document Download Start Date | 2025-05-20 05:30 AM | Document Download End Date | 2025-06-04 11:30 AM |
Bid Submission Start Date | 2025-05-20 05:30 AM | Bid Submission End Date | 2025-06-04 11:30 AM |
Clarification start Date | 2025-05-20 05:30 AM | Clarification End Date | 2025-05-28 11:30 AM |
Bid Validity Period (in Days) | 90 |
Tender Fee | ₹ 10000 |
EMD (Earnest Money Deposit) | ₹ 2,47,953 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Online |
Work Description - Earthwork, Cement Concrete, Reinforced Cement Concrete, And Rr Stone Works
The Additional Chief Engineer, Drainage Circle, BBSR, representing the State Government and UT, invites open tenders for the "Improvement to Balgania Nalla along with structures in Nuagaon Block," a civil works project involving Earthwork, Cement Concrete, Reinforced Cement Concrete, and RR Stone Works. The project, valued at ₹2,47,95,281, is referenced by Tender Number ACEDC-BBSR/DD-KHR-01/2025-26 and Tender ID 2025_CEDC_113597_1. Interested bidders can download tender documents from May 20, 2025, 11:00 AM until June 4, 2025, 05:00 PM. Bid submission commences and ends on the same dates, respectively. Bids will be opened on June 5, 2025, at 11:00 AM at the office of the Addl. Chief Engineer, Drainage Circle,BBSR. A fixed EMD of ₹2,47,953 is required, though exemptions may be allowed through BG/ST. The tender fee is ₹10,000, payable online, and this tender employs a two-cover system: Cover 1 for Fee/PreQual/Technical documents (Tender Cost, EMD, GSTIN, PAN, Contractor RC and Affidavit, NRC / Relationship Certificate, Other Doc) and Cover 2 for the Bill of Quantity. The completion period for this project is 330 days, and bids must remain valid for 90 days.
Get Hassle free financing for your business
Office Inviting Bids | Addl. Chief Engineer, Drainage Circle,bbsr |
Address | O/o The Addl. Chief Engineer, Drainage Circle,bbsr |
Contact Details | NA |
NA | |
Website | NA |
Improvement To Hajabandha Mip At Pustapur In Khallikote Block Under Improvement..read more
Nalla Covering Work With Mesh Near Runway 23..read more
Construction Of Various Water Harvesting Structures Under Mjsa 2.0 Phase-i In..read more
Desilting Of Nalla From Railway Track To Kopri Signal At Koprigaon..read more
Survey And Planning For Command Area Development And Water Management...read more
All the major brands in each raw material category