Preparation Of Detailed Project Report, Tender Document,eia And Social Impact Assessment Report For Integration Of Csmt Metro Station Of Mumbai Metro Line 3 With New Administrative Building Of Csmt Railway Station Through Underground Connection
Tender Title | Preparation Of Detailed Project Report, Tender Document,eia And Social Impact Assessment Report For Integration Of Csmt Metro Station Of Mumbai Metro Line 3 With New Administrative Building Of Csmt Railway Station Through Underground Connection | ||
Tender ID | 2025_MMRCL_224070_1 | Tender Reference Number | MML3/UGC02/CPM02/RLDA |
Tender Type | Limited | ||
Tender Opening Date | 2025-02-17 09:30 AM | Tender Closing Date | 2025-03-26 09:30 AM |
Tender Value | Refer Document | Tender Location | 2nd Floor, Transit Office,mmrcl,bkc,bandra, Mumbai , Mumbai Subueban , Maharashtra |
Tender Category | Services | Product Category | Civil And Architectural Services Tenders, Civil And Construction Tenders, Civil Works Others Tenders, Consultancy Services Tenders, Environmental Service Tenders, Other Consultancy Services Tenders, Real Estate Service Tenders |
ePublished Date | 2025-01-16 09:30 AM | Bid Opening Date | 2025-03-27 09:30 AM |
Document Download Start Date | 2025-01-16 09:30 AM | Document Download End Date | 2025-03-26 09:30 AM |
Bid Submission Start Date | 2025-02-17 09:30 AM | Bid Submission End Date | 2025-03-26 09:30 AM |
Clarification start Date | 2025-02-10 06:00 AM | Clarification End Date | 2025-02-28 07:30 AM |
Bid Validity Period (in Days) | 180 |
Tender Fee | ₹ 5900 |
EMD (Earnest Money Deposit) | ₹ 2,00,000 |
EMD Fee Type | Fixed |
Payment Instruments/Mode | Offline |
Work Description - Preparation Of Detailed Project Report, Tender Document,eia And Social Impact Assessment Report For Integration Of Csmt Metro Station Of Mumbai Metro Line 3 With New Administrative Building Of Csmt Railway Station Through Underground Connection
Mumbai Metro Rail Corporation Limited (MMRCL), a Public Sector Undertaking, invites limited tenders for the "Preparation of Detailed Project Report, Tender Document, EIA and Social Impact Assessment Report for Integration of CSMT Metro Station of Mumbai Metro Line 3 with New Administrative Building of CSMT Railway Station through underground connection," under Tender Reference Number MML3/UGC02/CPM02/RLDA. This is a consultancy service tender with a lump-sum form of contract. The tender documents can be downloaded from 16-Jan-2025 03:00 PM until 26-Mar-2025 03:00 PM. A mandatory Earnest Money Deposit (EMD) of ₹2,00,000.00 (Rupees Two Lakhs Only) is required, payable offline to Mumbai Metro Rail Corporation Limited. The tender fee is set at ₹5,900.00 (Rupees Five Thousand Nine Hundred Only), payable offline. Bids must be submitted between 17-Feb-2025 03:00 PM and 26-Mar-2025 03:00 PM. The bid opening date is scheduled for 27-Mar-2025 03:00 PM at 2nd floor, Transit Office MMRCL,BKC, Bandra, Mumbai. Prospective bidders should note the pre-bid meeting on 12-Feb-2025 02:30 PM at Aazad Maidan, Gate No 3, CSMT, near fashion street. This tender involves a two-cover system, with the first cover encompassing fee/prequalification/technical documents and the second cover containing the price sheet. The validity period for the bids is 180 days, and the estimated period of work is 90 days. Payment instruments accepted are Demand Draft, NEFT, and R-T-G-S. The Tender Inviting Authority is Executive Director Civil, located at 2nd floor, Transit Office MMRCL,BKC, Bandra, Mumbai, Pincode 400051.
Get Hassle free financing for your business
Office Inviting Bids | Executive Director Civil |
Address | 2nd Floor, Transit Office Mmrcl,bkc, Bandra, Mumbai |
Contact Details | NA |
NA | |
Website | NA |
Property Development At Ground Floor Of Indraprastha Metro Station Of Line-..read more
Consultancy Services For Preparation Of Detailed Project Report For Railway Connectivity..read more
Under River Consevation Schemepreparation Of Exploratory Survey And Preparation Of Feasibility..read more
Property Development As Temporary Structure Near Dwarka Metro Station (line-3)corridor Of..read more
Preparation Of Detailed Project Report In Connection With Up Gradation Of..read more
All the major brands in each raw material category