| Tender Title | Ramjibanpur-Ketugram-Katwa Road SH-6 Pavement Evaluation, Widening, and Strengthening Project | ||
| Tender ID | 2026_WBPWD_5077874_1 | Tender Reference Number | WBPWDRoadsEEBNHDNIQ19/26-2027 |
| Tender Type | Open Tender | ||
| Tender Opening Date | 2026-10-08 11:00 AM | Tender Closing Date | 2026-10-14 11:30 AM |
| Tender Value | Refer Document | Tender Location | Burdwan , Bardhaman , West Bengal |
| Tender Category | Works | Product Category | Civil And Construction Tenders, Road Construction Tenders, Civil Works Others Tenders |
| ePublished Date | 2026-10-06 06:00 PM | Bid Opening Date | 2026-10-27 12:00 PM |
| Document Download Start Date | 2026-10-06 06:30 PM | Document Download End Date | 2026-10-14 11:30 AM |
| Bid Submission Start Date | 2026-10-08 11:00 AM | Bid Submission End Date | 2026-10-14 11:30 AM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | 120 |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | ₹ 15,000 |
| EMD Fee Type | Fixed |
| Payment Instruments/Mode | Online |
Work Description - Structural Evaluation, Widening And Strengthening Of Flexible Road Pavements Using Falling Weight Deflectometer (fwd), Technique For Preparation Of Detailed Project Report With Allied Works Of Ramjibanpur-ketugram-katwa (rkk) Road (sh-6) From76.00...
This tender, issued by the Public Works Department, specifically the Executive Engineer, Burdwan North Highway Division, seeks qualified bidders for the vital structural evaluation, widening, and strengthening of flexible road pavements along Ramjibanpur-Ketugram-Katwa (RKK) Road (SH-6) from kilometre 76.00 onwards. The scope of work involves the application of Falling Weight Deflectometer (FWD) techniques for detailed assessment and the subsequent preparation of a comprehensive Detailed Project Report, along with all allied works necessary to enhance the road's structural integrity and capacity. Bidders are advised to note the critical dates, with the document download period commencing on 6th October 2026 at 06:30 PM and concluding on 14th October 2026 at 11:30 AM. The bid submission period starts on 8th October 2026 at 11:00 AM and closes simultaneously with the document download end date. The Earnest Money Deposit (EMD) required is ₹15,000, with provisions for EMD exemption or submission through BG/ST. The tender is an open tender, utilizing an item rate form of contract, and will be conducted in two covers. The bid opening is scheduled for 27th October 2026 at 12:00 PM at the office of the Executive Engineer, Burdwan North Highway Division, located at Aftab Club Court Compound, 1st Floor, PO and Dist-Purba Burdwan, Pin-713101. This project represents a significant opportunity to contribute to the infrastructure development within the Burdwan region.

Get Hassle free financing for your business
| Office Inviting Bids | Executive Engineer, Burdwan North Highway Division |
| Address | Executive Engineer Burdwan North Highway Division, Aftab Club Court Compound 1st Floor, Po And Dist-purba Burdwan, Pin-713101 |
| Contact Details | NA |
| NA | |
| Website | NA |
Widening And Strengthening Of Link Road From Luksar To Delhi Border (id-24) Including Reconstruction In …read more
Widening And Strengthening Of 4 No. Roads In Julana Constituency In Jind Distt. (work Programme …read more
Widening And Strengthening Of Madhosingh Mahathua Asnaav Mushilatpur Road
Widening And Strengthening Of Sonwara Bypass Road From Km 6 To Lakhna Link Road Via …read more
Widening And Strengthening/reconstruction Work Of Kherabani (sh-15)-ranighaghar (adb) Road (total Length-9.172 Km) Under Road Division …read more
Widening And Strengthening Of Link Road From Luksar To Delhi Border (id-24) Including Reconstruction In …read more
Widening And Strengthening Of 4 No. Roads In Julana Constituency In Jind Distt. (work Programme …read more
Widening And Strengthening Of Madhosingh Mahathua Asnaav Mushilatpur Road
Widening And Strengthening Of Sonwara Bypass Road From Km 6 To Lakhna Link Road Via …read more
Widening And Strengthening/reconstruction Work Of Kherabani (sh-15)-ranighaghar (adb) Road (total Length-9.172 Km) Under Road Division …read more
All the major brands in each raw material category