| Tender Title | Supply and Installation of Solar Photovoltaic Water Pumping Systems Uttar Pradesh | ||
| Tender ID | GEM/2026/B/8253971 | Tender Reference Number | NA |
| Tender Type | NA | ||
| Tender Opening Date | 2026-11-07 04:30 PM | Tender Closing Date | 2026-11-23 05:00 PM |
| Tender Value | Refer Document | Tender Location | NA , Moradabad , Uttar Pradesh |
| Tender Category | Goods | Product Category | Solar Installation and Products Tenders |
| ePublished Date | 2026-11-07 12:00 AM | Bid Opening Date | |
| Document Download Start Date | Document Download End Date | ||
| Bid Submission Start Date | 2026-11-07 04:30 PM | Bid Submission End Date | 2026-11-23 05:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | Refer document |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - NA
This tender, issued by the Minor Irrigation Department, Uttar Pradesh, under Bid Number GEM/2026/B/8253971, seeks comprehensive proposals for the supply and installation of 255 units of Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3). The bidding period commences on November 7, 2026, at 4:30 PM and concludes on November 23, 2026, at 5:00 PM. The procurement is being managed by the Office of the Chief Engineer, Minor Irrigation, UP, Lucknow, with a specific administrative point of contact at the Office of the Executive Engineer, Minor Irrigation Division, Moradabad, located at Kendriya Bhandar, Laghu Sinchai, Dilari Road, Near Vivekanand Hospital, Moradabad (PIN: 244001). This opportunity presents a significant project for entities specializing in solar pumping solutions, requiring adherence to national standards for renewable energy deployment in the state of Uttar Pradesh.

Get Hassle free financing for your business
| Office Inviting Bids | NA |
| Address | NA |
| Contact Details | NA |
| NA | |
| Website | NA |
Request For Selection (rfs) Of Developer For Setting Up Battery Energy Storage Systems (bess) And …read more
Request For Selection (rfs) Of Developer For Setting Up Battery Energy Storage Systems (bess) And …read more
All the major brands in each raw material category