| Tender Title | Two-Lane Paved Shoulder Upgrades for Malegaon National Highway Missing Link | ||
| Tender ID | 2026_MoRTH_917047_1 | Tender Reference Number | 06/EENH/AKL/2026-27, Dt.10.07.2026 |
| Tender Type | Open Tender | ||
| Tender Opening Date | 2026-07-13 01:00 PM | Tender Closing Date | 2026-10-15 05:30 PMExtended · originally 27 Aug 2026, 05:30 PM |
| Tender Value | ₹ 13.73 Cr | Tender Location | Malegaon , Washim , Maharashtra |
| Tender Category | Works | Product Category | Road Construction Tenders, Civil And Construction Tenders, Civil Works Others Tenders |
| ePublished Date | 2026-07-13 01:00 PM | Bid Opening Date | 2026-10-16 05:30 PMExtended · originally 28 Aug 2026, 05:30 PM |
| Document Download Start Date | 2026-07-13 01:00 PM | Document Download End Date | 2026-10-15 05:30 PMExtended · originally 27 Aug 2026, 05:30 PM |
| Bid Submission Start Date | 2026-07-13 01:00 PM | Bid Submission End Date | 2026-10-15 05:30 PMExtended · originally 27 Aug 2026, 05:30 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | 120 |
| Tender Fee | ₹ 11800 |
| EMD (Earnest Money Deposit) | ₹ 13,73,000 |
| EMD Fee Type | Fixed |
| Payment Instruments/Mode | Offline |
Work Description - Rehabilitation And Upgradation Of Two Lane Road With Paved Shoulders On Malegaon Missing Link Section Of Nh461b From Akola Naka To Junction With Nh 161 At Malegaon Bypass (from Km 0.00 To 3.00 Total Length 3.00 Km) And 0.00 To 0.460 Length Of Nh753c
The Ministry of Road Transport and Highways, through the Secretary NH (PW) Konkan Bhavan Navi Mumbai, invites bids from eligible and qualified contractors for an Open Tender under an EPC Contract for the "Rehabilitation and Upgradation of Two-lane Road with paved shoulders on Malegaon Missing Link section of NH461B from Akola Naka to Junction with NH 161 at Malegaon Bypass (from km 0.00 to 3.00 Total Length 3.00 km) and 0.00 to 0.460 length of NH753C." This critical infrastructure project, located in Malegaon, involves a total length of approximately 3.46 km and has an estimated Tender Value of ₹13,72,78,342, with a stipulated Period of Work of 180 days. Interested parties can download tender documents and submit their bids from 13-Jul-2026 01:00 PM. A mandatory Pre-Bid Meeting will be held on 28-Jul-2026 at 12:30 PM at the Secretary NH (PW) Konkan Bhavan Navi Mumbai office. The last date for document download and bid submission is 27-Aug-2026 05:30 PM, with bids scheduled to be opened on 28-Aug-2026 05:30 PM at the same address. A Tender Fee of ₹11,800 and an Earnest Money Deposit (EMD) of ₹13,73,000 are required, both payable to the Executive Engineer NHD Akola, with EMD exemption allowed for eligible bidders. This procurement follows a two-cover system, comprising Fee/PreQual/Technical and Finance (BOQ) submissions. Prospective bidders are encouraged to participate in this significant national highway development initiative.

Get Hassle free financing for your business
| Office Inviting Bids | Secretary Nh (pw) Konkan Bhavan Navi Mumbai |
| Address | Secretary Nh (pw) Konkan Bhavan Navi Mumbai |
| Contact Details | NA |
| NA | |
| Website | NA |
Consultancy Services For Preparation Of Dpr For Widening To Four Lane With Paved Shoulder From …read more
Upgradation Of Existing Two- Lane With Paved Shoulders Carriageway Of Nagaur-bikaner Section Of Nh-62 From …read more
Upgradation Of Existing Two- Lane With Paved Shoulders Carriageway Of Nagaur-bikaner Section Of Nh-62 From …read more
Cs For Preparation Of Feasibility Study And Detailed Project Report (dpr) Of Existing 02 Lane …read more
Balance Work Of Umaria Shahdol 2-lane With Paved Shoulder Road Project In The State Of …read more
Consultancy Services For Preparation Of Dpr For Widening To Four Lane With Paved Shoulder From …read more
Upgradation Of Existing Two- Lane With Paved Shoulders Carriageway Of Nagaur-bikaner Section Of Nh-62 From …read more
Upgradation Of Existing Two- Lane With Paved Shoulders Carriageway Of Nagaur-bikaner Section Of Nh-62 From …read more
Cs For Preparation Of Feasibility Study And Detailed Project Report (dpr) Of Existing 02 Lane …read more
Balance Work Of Umaria Shahdol 2-lane With Paved Shoulder Road Project In The State Of …read more
All the major brands in each raw material category