Korba West Thermal Power Project: EPC for Coal, Biomass, and Mill Reject Handling Systems

Works
Energy Oil and Gas
+ 2
Machinery and Tools
Civil And Construction
  • Opening DateJul 21, 2026
  • Closing DateOct 28, 2026Extended · was 5 Aug 2026
  • Tender Amount Refer Document

Tender Overview

Tender Title Korba West Thermal Power Project: EPC for Coal, Biomass, and Mill Reject Handling Systems
Tender ID2026_BHEL_62994_1Tender Reference NumberBHEL/CPC/KRW/EPC_CHP_MRHS/ 27/038
Tender TypeOpen Tender
Tender Opening Date2026-07-21 06:00 PMTender Closing Date2026-10-28 11:00 AMExtended · originally 5 Aug 2026, 11:00 AM
Tender Value Refer Document Tender LocationKorba West , Korba , Chhattisgarh
Tender CategoryWorksProduct CategoryEnergy Oil and Gas Tenders, Machinery and Tools Tenders, Civil And Construction Tenders
Tender Overview
  • Tender TitleKorba West Thermal Power Project: EPC for Coal, Biomass, and Mill Reject Handling Systems
  • Tender ID2026_BHEL_62994_1
  • Tender Reference NumberBHEL/CPC/KRW/EPC_CHP_MRHS/ 27/038
  • Tender TypeOpen Tender
  • Tender Opening Date2026-07-21 06:00 PM
  • Tender Closing Date2026-10-28 11:00 AMExtended · originally 5 Aug 2026, 11:00 AM
  • Tender Value Refer Document
  • Tender LocationKorba West,Korba, Chhattisgarh
  • Tender CategoryWorks
  • Product CategoryEnergy Oil and Gas Tenders, Machinery and Tools Tenders, Civil And Construction Tenders

Important Dates

ePublished Date 2026-07-21 05:40 PM Bid Opening Date2026-10-28 05:00 PMExtended · originally 5 Aug 2026, 05:00 PM
Document Download Start Date2026-07-21 06:00 PMDocument Download End Date2026-10-28 11:00 AMExtended · originally 5 Aug 2026, 11:00 AM
Bid Submission Start Date2026-07-21 06:00 PMBid Submission End Date2026-10-28 11:00 AMExtended · originally 5 Aug 2026, 11:00 AM
Clarification start Date2026-07-21 06:00 PMClarification End Date2026-07-31 06:00 PM
Bid Validity Period (in Days)180
Important Dates
  • ePublished Date 2026-07-21 05:40 PM
  • Bid Opening Date2026-10-28 05:00 PMExtended · originally 5 Aug 2026, 05:00 PM
  • Document Download Start Date2026-07-21 06:00 PM
  • Document Download End Date2026-10-28 11:00 AMExtended · originally 5 Aug 2026, 11:00 AM
  • Clarification End Date2026-07-21 06:00 PM
  • Clarification End Date2026-07-31 06:00 PM
  • Bid Submission Start Date2026-07-21 06:00 PM
  • Bid Validity Period (in Days)180

Corrigenda

Corrigendum25 updatesLatest on 22 Oct 2026 Submission Ends: 5 Aug 202628 Oct 2026
Date changes overall
  • Download Ends5 Aug 202628 Oct 2026
  • Submission Ends5 Aug 202628 Oct 2026
  • Bid Opening5 Aug 202628 Oct 2026
  1. Corrigendum-17Date Change #1122 Oct 2026
    Extension of key dates
    • Download Ends22 Oct 202628 Oct 2026
    • Submission Ends22 Oct 202628 Oct 2026
    • Bid Opening22 Oct 202628 Oct 2026
    PDFCorrigendum-17-22-10-2026.pdf259 KB
  2. Corrigendum-16Date Change #1013 Oct 2026
    Extension of key dates
    • Download Ends13 Oct 202622 Oct 2026
    • Submission Ends13 Oct 202622 Oct 2026
    • Bid Opening13 Oct 202622 Oct 2026
    PDFCorrigendum-16-13-10-2026.pdf257 KB
  3. Corrigendum-15Date Change #96 Oct 2026
    Extension of key dates
    • Download Ends6 Oct 202613 Oct 2026
    • Submission Ends6 Oct 202613 Oct 2026
    • Bid Opening6 Oct 202613 Oct 2026
    PDFCorrigendum-15-06-10-2026.pdf258 KB
  4. Corrigendum-14Other #1429 Sep 2026
    5 filesextracted from Corrigendum-14.rar
    Corrigendum-14
    • PDF0_Corrigendum-14_dtd_29-09-26.pdf471 KB
    • PDFAnnexure-1-TP-05 Drg.pdf6.5 MB
    • PDFAnnexure-2 Revised Broad Scope Split rev02.pdf201 KB
    • XLSXAnnexure-3- Revised TCC ANNEXURE -5 Limiting Auxiliary Power Consumption ICHP ECHP.xlsx17 KB
    • XLSXAnnexure-4 Korba West Plant co-ordinate conversion system.xlsx10 KB
  5. Corrigendum-13Date Change #828 Sep 2026
    Extension of key dates
    • Download Ends28 Sep 20266 Oct 2026
    • Submission Ends28 Sep 20266 Oct 2026
    • Bid Opening28 Sep 20266 Oct 2026
    PDFCorrigendum-13-28-09-2026.pdf257 KB
  6. Corrigendum-12Date Change #718 Sep 2026
    Extension of key dates
    • Download Ends18 Sep 202628 Sep 2026
    • Submission Ends18 Sep 202628 Sep 2026
    • Bid Opening18 Sep 202628 Sep 2026
    PDFCorrigendum-12-18-09-2026.pdf256 KB
  7. Corrigendum-11Other #1318 Sep 2026
    PDFCorrigendum_11_dated_18_09_2026.pdf1.2 MB
  8. Corrigendum-10Date Change #610 Sep 2026
    Extension of key dates
    • Download Ends10 Sep 202618 Sep 2026
    • Submission Ends10 Sep 202618 Sep 2026
    • Bid Opening10 Sep 202618 Sep 2026
    PDFCorrigendum-10-10-09-2026.pdf253 KB
  9. Corrigendum-09Date Change #53 Sep 2026
    Extension of key dates
    • Download Ends3 Sep 202610 Sep 2026
    • Submission Ends3 Sep 202610 Sep 2026
    • Bid Opening3 Sep 202610 Sep 2026
    PDFCorrigendum-9-03-09-2026.pdf252 KB
  10. Corrigendum-08Other #121 Sep 2026
    PDFCorrigendum-8_dtd_01-09-26.pdf9.3 MB
  11. Attachment-8 to Corrigendum-7Other #1127 Aug 2026
    5 filesextracted from Annexure-5-Part-9_Amendment_to_Cust_Tech_Specs.rar
    Annexure-5-Part-9_Amendment_to_Cust_Tech_Specs
    • PDF1322552-51_Amendment_No_05_to_Technical_Spec_Part3.pdf10.6 MB
    • PDF1322553-52_Amendment_No_03_Commercial_Spec_Part1.pdf1.1 MB
    • PDF1322554-53_Amendment_No_03_Commercial_Spec_Part2.pdf6.5 MB
    • PDF1322555-54_Amendment_No_03_Commercial_Spec_Part3.pdf318 KB
    • PDF1322556-55_Amendment_No_03_Commercial_Spec_Part4.cleaned.pdf1.8 MB
  12. Attachment-7 to Corrigendum-7Other #1027 Aug 2026
    PDF1320694-40_Amendment_No_03_Part_10_BORE_HOLE_DATA_LAB_TEST_DATA.pdf37.3 MB
  13. Attachment-6 to Corrigendum-7Other #927 Aug 2026
    6 filesextracted from Annexure-5_Part-7_Amendment_to_Cust_Tech-Specs.rar
    Annexure-5_Part-7_Amendment_to_Cust_Tech-Specs
    • PDF1320693-39_Amendment_No_03_Part_9_Area_Drainage_Report.pdf17.5 MB
    • PDF1321084-45_Amendment_No_04_to_Technical_Specification_Part_1_of_3.pdf5.9 MB
    • PDF1321085-46_Amendment_No_04_to_Technical_Specification_Part_2_of_3.pdf8.9 MB
    • PDF1321086-47_Amendment_No_04_to_Technical_Specification_Part_3_of_3.pdf3.5 MB
    • PDF1322550-49_Amendment_No_05_to_Technical_Spec_Part1.cleaned.pdf2.5 MB
    • PDF1322551-50_Amendment_No_05_to_Technical_Spec_Part2.cleaned.pdf2.9 MB
  14. Attachment-5 to Corrigendum-7Other #827 Aug 2026
    RARAnnexure-5_Part-6_Amendment_to_Cust_Tech-Specs.rar34.8 MB
  15. Attachment-4 to Corrigendum-07Other #727 Aug 2026
    3 filesextracted from Annexure-5_Part-5_Amendment_to_Cust_Tech_Specs.rar
    Annexure-5-Part-5_Amendment_to_Cust_Tech_Specs
    • PDF1320685-31_Amendment_No_03_Part_1.pdf7.5 MB
    • PDF1320686-32_Amendment_No_03_Part_2.pdf9.8 MB
    • PDF1320687-33_Amendment_No_03_Part_3.pdf16.5 MB
  16. Attachment-3 to Corrigendum-7Other #627 Aug 2026
    7 filesextracted from Annexure-5_Part-4_Amendment_to_Cust_Tech-Specs.rar
    Annexure-5_Part-4_Amendment_to_Cust_Tech-Specs
    • PDF1320683-27_Amendment_No_01_to_Commercial_Specification_Part_1.pdf3.5 MB
    • PDF1320684-30_Amendment_No_01_to_Commercial_Specification_Part_2.pdf13.1 MB
    • PDF24_amendment_2_to_tech_spec_part_4_of_8_26-07-2024.pdf18.3 MB
    • PDF25_amendment_2_to_tech_spec_part_5_of_8_26-07-2024.pdf1.2 MB
    • PDF26_amendment_2_to_tech_spec_part_6_of_8_26-07-2024.pdf1.1 MB
    • PDF27_amendment_2_to_tech_spec_part_7_of_8_26-07-2024.pdf2.5 MB
  17. Attachment-2 to Corrigendum-07Other #527 Aug 2026
    RARAnnexure-5_Part-3_Amendment_to_Cust_Tech-Specs.rar39.5 MB
  18. Attachment-1 to Corrigendum-7Other #427 Aug 2026
    6 filesextracted from Annexure-5_Part-2-Clarifications-Customer_Technical_Specs.rar
    Annexure-5-Part-2-Clarifications-Customer_Technical_Specs
    • PDF1320695-41_Clarification_No_03_to_Technical_Specifications_Part_1.pdf5.9 MB
    • PDF1320696-42_Clarification_No_03_Attachment_17_presigned_preintegrity_pact_Part_2.pdf640 KB
    • PDF1321083-44_Clarification_No_04_To_Technical_Specification.pdf11.4 MB
    • PDF1322549-48_Clarification_No_05_to_Technical_Specification.cleaned.pdf388 KB
    • PDF14_clarification_1_to_technical_specification_dtd_19-07-2024.pdf7.3 MB
    • PDF20_Clarification_2_to_tech_spec_26-07-2024.pdf6.0 MB
  19. Corrigendum-07Other #327 Aug 2026
    6 filesextracted from Corrigendum-7-with-Annexure-1_2_3_4_5.rar
    Corrigendum-7-with-Annexure-1_2_3_4_5.1
    • PDFAnnexure-1-TCC-Annexure -2 Scope matrix ICHP & ECHP Rev01.pdf105 KB
    • PDFAnnexure-2-MOM DATED 11-11-25.pdf186 KB
    • PDFAnnexure-3-GEOTECH REPORT_BHEL Korba.pdf8.3 MB
    • PDFAnnexure-4-TCC-ANNEXURE-26_AMENDMENT_GRADING& LEVELLING.pdf9.2 MB
    • PDFAnnexure-5_Part-1-Pages 651 to 1154 from 02_Section_VI_Part_A.pdf18.4 MB
    • PDFCorrigendum-7_dtd_27-08-26 to pre-bid queries.pdf589 KB
  20. Corrigendum-06Date Change #427 Aug 2026
    Extension of key dates
    • Download Ends27 Aug 20263 Sep 2026
    • Submission Ends27 Aug 20263 Sep 2026
    • Bid Opening27 Aug 20263 Sep 2026
    PDFCorrigendum-6-27-08-2026.pdf249 KB
  21. Corrigendum-04Other #221 Aug 2026
    PDFCorrigendum-4-PBQ_Reply.pdf18.2 MB
  22. Corrigendum-05Date Change #320 Aug 2026
    Extension of key dates
    • Download Ends20 Aug 202627 Aug 2026
    • Submission Ends20 Aug 202627 Aug 2026
    • Bid Opening20 Aug 202627 Aug 2026
    PDFCorrigendum-5-20-08-2026.pdf250 KB
  23. Corrigendum-03Date Change #213 Aug 2026
    Extension of key dates
    • Download Ends13 Aug 202620 Aug 2026
    • Submission Ends13 Aug 202620 Aug 2026
    • Bid Opening13 Aug 202620 Aug 2026
    PDFCorrigendum-3-13-08-2026.pdf247 KB
  24. Corrigendum-02Date Change #15 Aug 2026
    Extension of key dates
    • Download Ends5 Aug 202613 Aug 2026
    • Submission Ends5 Aug 202613 Aug 2026
    • Bid Opening5 Aug 202613 Aug 2026
    PDFCorrigendum-2-05-08-2026.pdf247 KB
  25. Corrigendum-01Other #122 Jul 2026
    PDFCorrigendum-1-22-07-2026.pdf258 KB

Cost Specification

Tender Fee Refer document
EMD (Earnest Money Deposit) ₹ 50,00,000
EMD Fee Type Fixed
Payment Instruments/Mode Offline

Tender Description

Work Description - Epc Package For Coal Handling Plant, Biomass Handling System And Mill Reject Handling System At 2x660 Mw Cspgcl Korba West Tpp (chhatisgarh, India).

Bharat Heavy Electricals Limited (BHEL), a leading Public Sector Undertaking, invites eligible bidders for an Open Tender (Tender Reference Number: BHEL/CPC/KRW/EPC_CHP_MRHS/ 27/038) for the comprehensive EPC Package for Coal Handling Plant, Biomass Handling System, and Mill Reject Handling System at the 2x660 MW CSPGCL Korba West Thermal Power Project located in Chhattisgarh, India. This significant 'Works' category contract, structured as an EPC (Engineering, Procurement, and Construction) project, has an estimated Period of Work spanning 1740 days.

The tender was e-Published on 21-Jul-2026 at 05:40 PM, with document download and bid submission commencing simultaneously on 21-Jul-2026 at 06:00 PM. A mandatory pre-bid meeting is scheduled for 28-Jul-2026 at 03:00 PM at the CPC VC Room, 8th Floor, BHEL Sadan, Sec 16A, Noida, providing an opportunity for clarifications, which will end on 31-Jul-2026 at 06:00 PM. Prospective bidders are required to submit an Earnest Money Deposit (EMD) of INR 50,00,000, payable offline via instruments such as DD, BG, BC, or BPO, while the Tender Fee is waived (INR 0.00). The deadline for both document download and bid submission is 05-Aug-2026 at 11:00 AM, with technical bids scheduled to open on the same day at 05:00 PM. All bids will maintain a validity period of 180 days. For further details or assistance, Mr. Anuranjan Kumar, Tender Inviting Authority, can be contacted at 8th Floor, CPC, BHEL Sadan, Sec 16A, Noida.

Ready to Take Your Business to the Next level ?

Get Hassle free financing for your business

Tender Contact Details

Office Inviting Bids Anuranjan Kumar
Address8th Floor, Cpc, Bhel Sadan, Sec 16a, Noida
Contact Details NA
Email NA
Website NA

Documents

Secure Your Projects with Tender Material & Financing

  • Secure competitive project proposals.
  • Strategic funding solutions to drive your projects to success.

Tenders with Similar Requirements

Works+3Civil And ConstructionEnergy Oil and GasPipe Line Project Bharat Heavy Electricals Limited
EPC for Coal, Biomass, and Mill Reject Handling Systems at NTPC Darlipali Stage-II, Odisha

Epc Of Coal Handling Plant, Biomass Handling System And Mill Reject Handling System At 1x800

…read more

Sundergarh, Odisha
Added on27 Sep 2026
Bid before12 Nov 2026
Tender value Refer Document
View Details
Goods+2Energy Oil and GasMachinery and Tools Information Technology Electronics And Communication Department
Supply of CG Shaft Seal Housings for Kakatiya Thermal Power Project

Supply Of Cg Shaft Seal Housings

Warangal, Andhra Pradesh
Added on24 Oct 2026
Bid before11 Nov 2026
Tender value Refer Document
View Details
Goods+2Construction MaterialEnergy Oil and Gas The West Bengal Power Development Corporation Limited
Supply of Non-Torrefied Biomass Pellets for Santaldih Thermal Power Plant

Procurement And Supply Of Non-torrefied Biomass Pellets To Santaldih Thermal Power Plant Of The Wbpdcl

North 24 Parganas, West Bengal
Added on05 Nov 2026
Bid before17 Nov 2026
Tender value Refer Document
View Details
Goods+2Construction MaterialEnergy Oil and Gas The West Bengal Power Development Corporation Limited
Supply of Non-Torrefied Biomass Pellets for Santaldih Thermal Power Plant

Procurement And Supply Of Non-torrefied Biomass Pellets To Santaldih Thermal Power Plant Of The Wbpdcl

North 24 Parganas, West Bengal
Added on05 Nov 2026
Bid before17 Nov 2026
Tender value Refer Document
View Details
Goods+2Machinery and ToolsElectrical Goods and Equipments Madhya Pradesh Power Generating Company Limited
Consumable Supplies for Mill Reject Handling System at Shri Singaji Thermal Power Station

Procurement Of Consumable Items For Mill Reject Handling System Installed At 2x600mw At Sstpp, Mppgcl,

…read more

Khandwa, Madhya Pradesh
Added on22 Oct 2026
Bid before13 Nov 2026
Tender value ₹ 18.01 L
View Details
Works+3Civil And ConstructionEnergy Oil and GasPipe Line Project Bharat Heavy Electricals Limited
EPC for Coal, Biomass, and Mill Reject Handling Systems at NTPC Darlipali Stage-II, Odisha

Epc Of Coal Handling Plant, Biomass Handling System And Mill Reject Handling System At 1x800

…read more

Sundergarh, Odisha
Added on27 Sep 2026
Bid before12 Nov 2026
Tender value Refer Document
View Details
Goods+2Energy Oil and GasMachinery and Tools Information Technology Electronics And Communication Department
Supply of CG Shaft Seal Housings for Kakatiya Thermal Power Project

Supply Of Cg Shaft Seal Housings

Warangal, Andhra Pradesh
Added on24 Oct 2026
Bid before11 Nov 2026
Tender value Refer Document
View Details
Goods+2Construction MaterialEnergy Oil and Gas The West Bengal Power Development Corporation Limited
Supply of Non-Torrefied Biomass Pellets for Santaldih Thermal Power Plant

Procurement And Supply Of Non-torrefied Biomass Pellets To Santaldih Thermal Power Plant Of The Wbpdcl

North 24 Parganas, West Bengal
Added on05 Nov 2026
Bid before17 Nov 2026
Tender value Refer Document
View Details
Goods+2Construction MaterialEnergy Oil and Gas The West Bengal Power Development Corporation Limited
Supply of Non-Torrefied Biomass Pellets for Santaldih Thermal Power Plant

Procurement And Supply Of Non-torrefied Biomass Pellets To Santaldih Thermal Power Plant Of The Wbpdcl

North 24 Parganas, West Bengal
Added on05 Nov 2026
Bid before17 Nov 2026
Tender value Refer Document
View Details
Goods+2Machinery and ToolsElectrical Goods and Equipments Madhya Pradesh Power Generating Company Limited
Consumable Supplies for Mill Reject Handling System at Shri Singaji Thermal Power Station

Procurement Of Consumable Items For Mill Reject Handling System Installed At 2x600mw At Sstpp, Mppgcl,

…read more

Khandwa, Madhya Pradesh
Added on22 Oct 2026
Bid before13 Nov 2026
Tender value ₹ 18.01 L
View Details
Moglix Supplier

Wide Range of Brands

All the major brands in each raw material category

credlix_adGet Credit Loan for your Tender ExecutionGet hassle free financing for your businessKnow Moregoogle play image