Bid outcomes
Lost bids carry more value than won ones — they chase big and lose bigWhere they win
2 authorities · 1 stateTop buyer organisations
Operating states
Top competitors
In tenders they both bid · bar shows how the awards splitRecent tenders awarded to CRESCENT CONSTRUCTION
- Replacement of MS window to UPVC window for Type-II Qtrs Block No. 16 and 17 (Qtr No. 85 to 96) including some repair work at GPA complex Nayagaon under SD-II, CD-II, APWD, Prothrapur.Chief Engineer Andaman Public Works Department (APWD) · Andaman And Nicobar · 13 Nov 2025₹7.9 L
- Construction of RCC Box Culvert and CC Drain behind MSME office and along the road existing between Plot No. 117 and Plot No. 120 under CD-II, APWD, Prothrapur.Chief Engineer Andaman Public Works Department (APWD) · Andaman And Nicobar · 20 Jan 2025₹13.5 L
- Construction of toe wall cum drain near Nagamuthu house at Teylerabad to protect the rural road.Chief Engineer Andaman Public Works Department (APWD) · Andaman And Nicobar · 3 Jan 2025₹9.3 L
- Face-lifting, repair and maintenance of Helicopter Terminal building and Administrative Hanger building alongwith construction of retaining wall cum compound wall along the road side adjacent to Inter Island Helicopter Terminal Port Blair.Chief Engineer Andaman Public Works Department (APWD) · Andaman And Nicobar · 5 Sept 2024₹20.2 L
- Repair and Maintenance of C C Road from Patwari Quarter to P. Guha house including pipe Railing at Ward No. 05 under Bambooflat- I Gram Panchayat.DIRECTORATE OF RD PRIS and ULBS · Andaman And Nicobar · 30 Jul 2024₹4.2 L
About CRESCENT CONSTRUCTION
CRESCENT CONSTRUCTION appears as a bidder on 29 government tenders on record, from 4 buyer authorities in 1 state. Of its 29 decided bids, it was awarded 7 — a 24.1% win rate — worth ₹71.5 L in total. Its most recent award on record is from 13 Nov 2025.
Its largest buyer by awarded value is Chief Engineer Andaman Public Works Department (APWD), at 71.3% of what it has won, out of 2 authorities that have awarded it work. Most of its awards come from Andaman And Nicobar. On priced bids, its median quote is 10.2% above the lowest bid (L1).
It most often bids against M/s Premier Steel Industries, KMS CONSTRUCTION and H Abbas. M/s Premier Steel Industries bid on 8 of the same tenders and won 3 of them; CRESCENT CONSTRUCTION won 3.