| Tender Title | ITBP Water Supply Line with PUF Insulation and Circuit Breaker Installation in Sikkim | ||
| Tender ID | GEM/2026/B/8241452 | Tender Reference Number | NA |
| Tender Type | NA | ||
| Tender Opening Date | 2026-11-04 06:04 PM | Tender Closing Date | 2026-11-25 07:00 PM |
| Tender Value | Refer Document | Tender Location | NA , East Sikkim , Sikkim |
| Tender Category | Goods | Product Category | Pipe Line Project Tenders, Water Storage And Supply Tenders, Civil Works Others Tenders |
| ePublished Date | Bid Opening Date | ||
| Document Download Start Date | Document Download End Date | ||
| Bid Submission Start Date | 2026-11-04 06:04 PM | Bid Submission End Date | 2026-11-25 07:00 PM |
| Clarification start Date | Clarification End Date | ||
| Bid Validity Period (in Days) | NA |
| Tender Fee | Refer document |
| EMD (Earnest Money Deposit) | Refer document |
| EMD Fee Type | NA |
| Payment Instruments/Mode | NA |
Work Description - NA
This tender, originating from the Central Armed Police Forces, specifically the Indo Tibetan Border Police (ITBP) under the Ministry of Home Affairs, presents a critical opportunity for qualified suppliers. With Bid Number GEM/2026/B/8241452, this procurement pertains to the "Providing Water Supply Line with PUF Insulation and Self" as detailed in the Bill of Quantities, alongside the supply of "Miniature Circuit Breakers Earth Leakage Circuit." The scope of work is being managed by the 63rd Bn Under Eastern Ftr, located at 73710263RD BN THQ ITBPSHERATHANG EAST SIKKIM(SIKKIM). The bid period commences on November 4, 2026, at 6:04 PM and concludes on November 25, 2026, at 7:00 PM. A substantial total quantity of 839 units is required for the specified items, underscoring the scale and importance of this project in ensuring operational readiness and infrastructure integrity for the ITBP.

Get Hassle free financing for your business
| Office Inviting Bids | NA |
| Address | NA |
| Contact Details | NA |
| NA | |
| Website | NA |
The Insulation Of Water Supply Pipeline At High Power Transmitter Stok
Work For Maintenance/servicing Of 132 Kv And 33 Kv Circuit Breaker And Replacement Of 33 …read more
The Insulation Of Water Supply Pipeline At High Power Transmitter Stok
Work For Maintenance/servicing Of 132 Kv And 33 Kv Circuit Breaker And Replacement Of 33 …read more
All the major brands in each raw material category