Bid outcomes
Lost bids carry more value than won ones — they chase big and lose bigWhere they win
1 authority · 0 statesTop buyer organisations
Operating states
2 awards on central/PSU portals carry no state
Top competitors
In tenders they both bid · bar shows how the awards splitRecent tenders awarded to RK CONSTRUCTION
- Replacement of damaged cement poles at Base workshop with extension of LT Line at Regional Store and erection of LT Overhead line at Face Pump working face of Garur Shovel and its OB dumping at Section II New Patch of mines of Rajrappa ProjectCentral Coalfields Limited · 23 Jul 2025₹7.5 L
- Extension/ erection of LT Overhead line (approx route length for erection/ extension is 1.5Km and dismantling of LT line(app route length for dismantling is 750 mtr) for period of 1 year(365 days) on as when and where required basisCentral Coalfields Limited · 20 Jul 2024₹8.9 L
About RK CONSTRUCTION CHITARPUR
RK CONSTRUCTION CHITARPUR appears as a bidder on 12 government tenders on record, from 1 buyer authority on central and PSU portals. Of its 12 decided bids, it was awarded 2 — a 16.7% win rate — worth ₹16.3 L in total. Its most recent award on record is from 31 Jul 2026.
Its largest buyer by awarded value is Central Coalfields Limited, at 100.0% of what it has won. On priced bids, its median quote is 2.7% above the lowest bid (L1).
It most often bids against Coalfield Construction, bkconstructionchitarpur@gmail.com and ForenTec Engineers Pvt. Limited. Coalfield Construction bid on 11 of the same tenders and won 4 of them; RK CONSTRUCTION CHITARPUR won 2.