Bid outcomes
Lost bids carry more value than won ones — they chase big and lose bigWhere they win
2 authorities · 0 statesTop buyer organisations
Operating states
14 awards on central/PSU portals carry no state
Top competitors
In tenders they both bid · bar shows how the awards splitRecent tenders awarded to P. C. CONSTRUCTION
- Dismantling,part changing,checking,replacement, overhauling and re-erection of parts of Gyratory crusher at CHP,Bina project as and when required for a period of two yearsNorthern Coalfields Limited · 29 Jan 2026₹21.0 L
- Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at CHP, Bina ProjectNorthern Coalfields Limited · 14 Jun 2025₹35.4 L
- Overhauling of Gyratory Crusher and Replacement of Cheveron Packing of Crusher at Krishnashila Project.Northern Coalfields Limited · 7 Mar 2025₹7.0 L
- Repair and fabrication of various miscellaneous elements in 1c, 4c in and repair of self aligning frames of 1c, 2c CHP, Bina Project.Northern Coalfields Limited · 5 Mar 2025₹3.1 L
- Changing of worn out crushing segments of movable roll of Double roll crusher no. 01 at Western CHP Phase III of Nigahi ProjectNorthern Coalfields Limited · 10 Feb 2025₹1.5 L
About P. C. CONSTRUCTION
P. C. CONSTRUCTION appears as a bidder on 55 government tenders on record, from 2 buyer authorities on central and PSU portals. Of its 55 decided bids, it was awarded 14 — a 25.4% win rate — worth ₹2.2 Cr in total. Its most recent award on record is from 26 Aug 2026.
Its largest buyer by awarded value is Northern Coalfields Limited, at 93.5% of what it has won, out of 2 authorities that have awarded it work. On priced bids, its median quote is 17.8% above the lowest bid (L1).
It most often bids against J.V.Engineering, M/S SHAKTI CONTRACTORS and M/S. SAKUR AND SANJAY ENTERPRISES. J.V.Engineering bid on 20 of the same tenders and won 7 of them; P. C. CONSTRUCTION won 2.