Bid outcomes
How their decided bids ended, by number and by valueWhere they win
1 authority · 0 statesTop buyer organisations
Operating states
6 awards on central/PSU portals carry no state
Top competitors
In tenders they both bid · bar shows how the awards splitRecent tenders awarded to HUZAIF CONSTRUCTION
- Cleaning of EDC Siding railway track line and allied surface for the period of 01 years under Newton Sub Area of Pench Area 2026-27.Western Coalfields Limited · 17 Jun 2026₹1.9 L
- Supplying of available Sand / OB / Earth filled Bags at various sites as per the requirement and staking them to provide a temporary water retaining point under Newton Sub Area of Pench Area.Western Coalfields Limited · 4 Apr 2026₹2.6 L
- Spraying of water through mobile tanker of capacity 5000 Lts for dust suppression at BG Siding (PWD Road) and Near Weigh Bridge for the period of 03 years under Newton Sub Area.Western Coalfields Limited · 26 Jul 2025₹4.3 L
- Repair of culvert connecting road from Jatachhapar and North Chandametta under GM Unit of Pench Area.Western Coalfields Limited · 11 Apr 2025₹9.0 L
- Repairing of approach road and ramp connecting coal stock yard and Weigh Bridges Ramp of BG Siding at Newton Sub Area of Pench Area.Western Coalfields Limited · 10 Apr 2025₹3.2 L
About HUZAIF CONSTRUCTION
HUZAIF CONSTRUCTION appears as a bidder on 8 government tenders on record, from 1 buyer authority on central and PSU portals. Of its 8 decided bids, it was awarded 6 — a 75.0% win rate — worth ₹23.3 L in total. Its most recent award on record is from 17 Jun 2026.
Its largest buyer by awarded value is Western Coalfields Limited, at 100.0% of what it has won. On priced bids, its median quote is the lowest (L1).
It most often bids against ASHAD INTERPRISES, RUDRA INFRASTRUCTURE and Global Era. ASHAD INTERPRISES bid on 3 of the same tenders and won 0 of them; HUZAIF CONSTRUCTION won 2.