Bid outcomes
How their decided bids ended, by number and by valueWhere they win
1 authority · 0 statesTop buyer organisations
Operating states
6 awards on central/PSU portals carry no state
Top competitors
In tenders they both bid · bar shows how the awards splitRecent tenders awarded to Centre for
- Hydrogeological study at Barauni Thermal Power Station.NTPC Limited · 15 Feb 2024₹11.8 L
- Construction of rainwater harvesting/recharge structures in NTPC/DarlipalliNTPC Limited · 10 Sept 2023₹30.4 L
- Construction of Re-Charge Pits for Roof Top Rainwater Harvesting System for Residential and Non-Residential Buildings in NTPC Lara Township.NTPC Limited · 15 Apr 2023₹41.0 L
- Construction of Rain Water Harvesting by recharge pit in Talaipali CMPNTPC Limited · 19 Jan 2022₹38.8 L
- Study Survey on Rain Water Harvesting at NTPC Tanda as per EnvironmentNTPC Limited · 19 Oct 2020₹8.3 L
About Centre for Ground Water Recharge
Centre for Ground Water Recharge appears as a bidder on 9 government tenders on record, from 1 buyer authority on central and PSU portals. Of its 9 decided bids, it was awarded 6 — a 66.7% win rate — worth ₹1.5 Cr in total. Its most recent award on record is from 1 Mar 2024.
Its largest buyer by awarded value is NTPC Limited, at 100.0% of what it has won. On priced bids, its median quote is the lowest (L1).
It most often bids against GEOSCIENCE CONSULTANCY SERVICES, water solutions and TIRUPATI DRILLING AND MINING SERVICES PVT LTD. GEOSCIENCE CONSULTANCY SERVICES bid on 2 of the same tenders and won 0 of them; Centre for Ground Water Recharge won 1.